Re: IBR updating


[ Follow Ups ] [ Post Followup ] [ Signature.net Forum ]

Posted by Grant Foraker on August 25, 2009 at 09:44:40:

In Reply to: Re: IBR updating posted by Barbara Brazil on August 25, 2009 at 08:47:48:

Another thought on IBR editing. Don't edit the IBR at all. Allow placeholder variables, like %1 etc.

Option 1: the front end program that wants to "edit" the IBR could do a SetGlobal (2,IBRData).

IBRDATA: IBRDATA$

Where IBRDATA$ = "%1=LP1" + "%2=08/01/2009" + "%3=08/25/2009". At run time PRINTER %1 would become PRINTER LP1.

Option 2: make the placeholders a value in #CFILES. Something like expressions. The front end program changes from editing a $ file to editing #CFILES.


Follow Ups:



Post a Followup

Name:
E-Mail:

Subject:

What is the name of the main Signature System's Product?  

Comments:

Optional Link URL:
Link Title:
Optional Image URL:

You may attach up to 5 files to your followup (see below):





Each file can be a maximum of 1MB in length Uploaded files will be purged from the server on a regular basis.


[ Follow Ups ] [ Post Followup ] [ Signature.net Forum ]