Documentation on PROMPT is a bit thin about the DatePick options. YY/MM/DD??? Took a while to figure out that was how DatePick was going to return the date to the PROMPT dialog. How about adding a full list to the documentation.

I tried MM/DD/YYYY and that worked OK. I then tried 07/01/2007, hoping to get an initial fill of the From Date and an initial setting of DatePick instead of the default today. See PROMPT2.jpg.

An initial fill is important, even if it's todays date. If you click OK with either of the dates blank, the compile crashes.

With 07/01/2007 in the spec file, I clicked on the From Date control and selected a date. Clicked OK. The selected date didn't display and the PROMPT dialog went on to the To Date control. Could only click CANCEL to escape.


Follow Ups:



Post a Followup

Name:
E-Mail:

Subject:

What is the name of the main Signature System's Product?  

Comments:

Optional Link URL:
Link Title:
Optional Image URL:

You may attach up to 5 files to your followup (see below):





Each file can be a maximum of 1MB in length Uploaded files will be purged from the server on a regular basis.


[ Follow Ups ] [ Post Followup ] [ Signature.net Forum ]