Posted by Grant E Foraker on April 15, 2020 at 07:08:36: Uploaded files: 3
Had to recreate 5 PDF reports for a customer on my developer PC. Copied them over to a workstation and imported them into DocMgr. I overrode the date and time (4/14 0700 ish) to put them in the right date and time (4/13 1400 ish). The date change took, but Import ignored the time override. Had to go into the control file (588) to fix the time.
Customer has Shadow Protect backup software that runs every hour. Getting the needed files from about 35 minutes before the failed run made this a whole lot easier.
Each file can be a maximum of 1MB in length Uploaded files will be purged from the server on a regular basis.