1. How do you delete a project? I tried deleting the prj file in Explorer. That creates a very unpleasant, frustrating experience in CPM.

2. Does every project have it's own "security" settings?

3. How can they be changed if they're wrong? The password is hidden and there's no reenter for verification.

4. If "Do not sync" is selected, why are all the files set to Sync=Yes. I just have to select them and reset the flag.

5. The "Add files" dialog shows 15 files out of 600 plus. Adding one at a time is slow. CTRL-Click is tedious and frustrating.

6. The "Add files" dialog displays ".INC", ".IBS", and ".MTB". But the drop down has not option for just ".IBS" Or just ".INC".

7. When I manually enter "*.IBS", the display refreshes and shows the IBS files but it also shows and displays the ".IBS.BAK" files. Don't want those. I changed the backup setting from append to replace. Maybe that will prevent this.

8. Why include INC files in a project? Is there any reason other than documentation?

9. Could CPM be made to set INC files, if selected, to Build=No?


Follow Ups:



Post a Followup

Name:
E-Mail:

Subject:

What is the name of the main Signature System's Product?

Comments:

Optional Link URL:
Link Title:
Optional Image URL:

You may attach up to 5 files to your followup (see below):






[ Follow Ups ] [ Post Followup ] [ Signature.net Forum ]