NUM2DATE


[ Follow Ups ] [ Post Followup ] [ Signature.net Forum ]

Posted by John Goodrich (67.22.153.28) on September 25, 2003 at 18:01:06:

Product: Comet2004 BETA

Version: Build 326

Date: September 17, 2003

The following changes have been made in this release:

2. Fixed a problem with the NUM2DATE function. Previously if you used
a type 4 conversion (i.e., NUM2DATE(date-value,4)), the function
always returned the day of the week as Thursday (regardless of the
actual day of the week).

Shouldn't this be corrected in all Comet 2000 also.


Follow Ups: